Risk Assessment

Penspen Integrity

Descripción

Penspen Integrity

ENVIAR EMAIL

  • HAZID – Hazard Identification
  • HAZOP – Hazard and Operability Studies
  • HAZAN – Hazard Analysis
  • FMEA – Failure Modes and Effects Analysis
  • FMECA – Failure Modes Effects and Criticality Analysis
  • QRA – Quantified Risk Analysis
  • FTA – Fault Tree Analysi
  • ETA – Event Tree Analysis
  • RLP – Remnant Life Prediction
  • RBDM – Risk Based Decision Making
  • Saving money (by justifying changes)
  • Improving safety (by targeting resources)
  • Assessments of proposed and modified pipeline systems to determine the acceptability of the design or modification. This also includes changes in use.
  • Assessments to determine the mitigation measures that are necessary for new designs.
  • Assessments to determine appropriate safety management systems.
  • Assessments of installation procedures.
  • Assessments to determine the acceptability of damaged pipelines.
  • Assessments to determine the measures necessary for pipeline modifications.
  • Assessments to determine the most appropriate inspection and maintenance strategy (RBI).
  • Assessments to determine the most appropriate repair and rehabilitation strategy.
  • Assessments to determine the remnant life, and necessary mitigation, for extending the life of pipelines.

Más información sobre este producto consulte en: http://www.penspen.com/capabilities/services/asset-integrity/risk-assessment/












Formulario de Contacto





Nombre Completo (requerido)

Empresa (requerido)

Correo electrónico (requerido)

Teléfono (requerido)

Página Web (si la tiene)

Mensaje (Requerido)