Descripción
ENVIAR EMAIL
OVERVIEW
KEY POINTS
KEY FEATURES
- Maximize NPV using destination selection and cutoff grade optimization
- Lerchs-Grossmann method for ultimate pit design with optional reblocking
- Floating cone technique for ultimate pit design
- Mining sequence design with limit on pushback width
- Options for simple slopes, complex slopes and slopes by azimuth
- Optional mining cost by bench or block
- Multithreaded *64-bit for faster calculation and greater volume of data processing
- Vertical discounting option
- Optimize schedules to follow most profitable ore extraction
- Determine optimal mining direction
- Multiple plants/processes, waste destinations, and stockpile reclaiming options
- Generate resource reports within the pit shell Create long term production schedules from series of pit shells
- Analyze varying capital-versus-productionrate scenarios
- Populate block model items for value/block, value/ ton, pit number, destination, and period mined
- Evaluate production rates
- Create reports and graphs for cutoff grade optimization results
- Visualize pit shells to create bench contours and solids
Más información sobre este producto consulte en: http://www.minesight.com/en-US/products/economicplanner.aspx