Maximum efficiency in ship construction
More Features
- Steel Working Drawings and parts lists
- The Build Strategy document, usually containing an exploded block/assembly view of the ship
- Installation Drawings, showing installation of systems and equipment
- Improved coordination between ship design and production enables better change control and more efficient use of resources.
- Minimise production costs by installing equipment and outfitting items at the earliest possible stages of assembly.
- Parallel ship design and assembly planning work reduces delivery time.
- Efficient creation of accurate assembly documents reduces man-hours, costs and delivery times.
- Ease of re-planning a ship’s construction strategy enables best use of available or alternative production facilities.