Pit Optimiser Feasibility Study

ENVIAR EMAIL

Pit Optimiser adds the third dimension

Maptek™ Vulcan™ Pit Optimiser was the ideal solution for assessing the economic value for a coal project and providing the basis for detailed design and scheduling work.

When MEC Mining was asked to complete a feasibility study for a steeply dipping resource in a complex metallurgical coal project, Vulcan Pit Optimiser provided the solution.

The deposit contained 5 seam groups, 3 major overthrust faults and shears, and normal faults in a single pit. Information supplied included a block model, economic assumptions and a geotechnical assessment. Margin rankings provided some clarity on basal seam and economics.

Mining stages were designed based on the Vulcan Pit Optimiser shell sequence which delivers optimum NPV.

  • Share This
  • Pit Optimiser feasibility study

Más información sobre este producto consulte en: http://www.maptek.com/forge/december_2013/vulcan_9_pit_optimiser_adds_the_third_dimension.html






Patrocinado
Compartir
Patrocinado

Este sitio web utiliza cookies.

Leer más