Power Supply Dondo Cement Factory

The projects objective is to supply the Dondo cement factory through a new 110/6 kV substation to be built next to the existing cement factory in Dondo,in Sofala Province – Mozambique.

Referanseinfo (carousel)

Project details

Project name:
Power Supply Dondo Cement Factory
Client:
Cimentos de Moçambique, S.A.R.L.
Location:
Mozambique
Time span:
2011-2012

The project consists of:

  • 110/6.0 kV, 16 MVA substation at Dondo Cement Factory.
  • ± 350m of 110kV double circuit transmission line connection to the existing EdM CL 71 110kV line, complete with 110kV underpass gantries.

Services Rendered:

  • Engineering
  • Assistance for Tendering
  • Construction Supervision