GARABITO 200MW

ENVIAR EMAIL

GARABITO 200MW

PuntarenasCosta Rica

Client:

MAN B&W DIESEL

Owner:

ICE

Contract Duration:

Jun 2009 / Aug 2010

Scope:

Complete civil works for a 200 MW power plant and switchyard utilizing 11 x 18V48/60 medium speed engines manufactured by MAN and running on diesel. The scope includes the revision of the OEM’s engineering and the execution of earthworks, concrete foundations, steel structures, buildings electrical installations, internal roads and site finish grade.

Más información sobre este producto consulte en: http://www.santoscmi.com/categories/power/fossil/reciprocating-engines/garabito-200mw.html






Patrocinado
Compartir
Patrocinado

Este sitio web utiliza cookies.

Leer más