Descripción
ENVIAR EMAIL
Fording River
This case study was originally published in our .
Richard Tremblay and Doug Stokes, then General Manager of Fording River, understood the Operation would be faced with hiring numerous new employees as a result of the attrition of an aging workforce. They conducted research at other mines, and decided that use of an equipment simulator could be a tremendous benefit in enhancing the existing safety training program.
Más información sobre este producto consulte en: http://www.teck.com/Generic.aspx?PAGE=Teck+Site/Responsibility+Pages/Sustainability+Pages/Case+Studies+pages/2007/Mine+Equipment&portalName=tc