Descripción
ENVIAR EMAIL
Reduce rig time with advanced CT equipment
Our new-generation coiled tubing (CT) equipment increases the efficiency of coiled tubing services, and offers unrestricted wellhead access. The CT EXPRESS rapid-deployment unit has reduced rig uptime from 3 hours to less than 30 minutes. The CT SEAS unit is more safe and efficient, and it reduces operations from 3.5 days to 2 days.
Rig up and rig down quickly in low-pressure land wells, with the capabilities of four trucks in two tractor trailer units.
Reduce the amount of time, and number of people needed with flexible, fit-for-purpose CT unit for offshore environments.
Protect wellhead integrity during deepwater CT operations.
Más información sobre este producto consulte en: http://www.slb.com/services/well_intervention/coiled_tubing/equipment.aspx