ASTORIA II 170MW

Empresa:

Descripción

Santos CMI Chile

ENVIAR EMAIL

ASTORIA II 170MW

TampicoMexico

Client:

SUEZ ENERGY – SNC LAVALIN

Owner:

SUEZ ENERGY – SNC LAVALIN

Contract Duration:

Mar 2009 / Jun 2010

Scope:

Electromechanical assembly of two heat recovery boilers (HRSG), complete with pressure parts, piping pre-fabrication and erection, steam drums,structures, inlet and outlet duct, painting and thermal insulation. The HRSGs will be later on loaded onto a barge to bring them to Queens, NY to be installed behind 2 x 7FA gas turbines.

Más información sobre este producto consulte en: http://www.santoscmi.com/categories/power/fossil/combined-cycle/astoria-ii-170mw.html


    Formulario de Contacto





    Nombre Completo (requerido)

    Empresa (requerido)

    Correo electrónico (requerido)

    Teléfono (requerido)

    Página Web (si la tiene)

    Mensaje (Requerido)