Descripción
ENVIAR EMAIL
Data Center Containers 200 – 1500kW
Share:
-for best-in-class speed, availability and operating efficiencyA Data Center is not a typical construction project, because there are more risks involved. The pace of cloud-based services and storage demand are making it harder to predict capacity needs. Construction can take years, tying up too much investment capital and expense. The PowerMOD* Modular Power Container from GE Critical Power is the answer, providing a containerized power infrastructure system designed to have the lowest total cost of ownership, the highest energy efficiency, the lowest total optimized footprint, and available in just months.
Build a new datacenter in four months
- Existing data center expansion
- New datacenter capacity
- Disaster recovery
- Temporary capacity during renovations or UPS upgrades
Power RatingUL 60Hz | DimensionsUL – 60Hz | Power RatingCE – 50Hz | DimensionsUL – 60Hz | CoolingOptions |
250kW/500kW | 20ft x 12ft | 200kW/400kW | 7.6m x 2.44m | DXChilled H2OEvaporativeCombo |
Up to 1000kW | 40ft x 12ft | Up to 800kW | 12.2m x 2.44m | |
Up to 1500kW | 60ft x 12ft | Up to 1200kW | 18.3m x 2.44m |
Más información sobre este producto consulte en: http://la.geindustrial.com/productos/turnkey-data-center-containers