Descripción
ENVIAR EMAIL
-
-
Last modified Dec 12, 2012
-
Project description:
On-site engineering support through the integration of a Nexans engineer in the R&D department of the customer (Alstom).
Customer challenges:
- An overweight problem jeopardized a new major train project : 300 kg needed to be eliminated
- Cabling was the only area which could be optimized
- Alstom did not have the skills or tools to simulate alternative designs
Nexans’ solutions:
- A Nexans engineer spent 2 weeks within the customer engineering department
- Through new cabling designs and product innovations, 336 kg could be saved
- Nexans Research Center was capable of proving by numerical simulation that these proposals would not endanger the reliability and lifetime of the new trains
- Alstom agreed to co-develop an entirely new product range granting Nexans a multi-year exclusivity on the supply of this product
Más información sobre este producto consulte en: http://www.nexans.com/eservice/Corporate-en/navigatepub_0_-29857/Resident_Engineer_at_Alstom.html