Power Supply Dondo Cement Factory
The projects objective is to supply the Dondo cement factory through a new 110/6 kV substation to be built next to the existing cement factory in Dondo,in Sofala Province – Mozambique.
Referanseinfo (carousel)
Project details
Project name:
Power Supply Dondo Cement Factory
Client:
Cimentos de Moçambique, S.A.R.L.
Location:
Mozambique
Time span:
2011-2012
The project consists of:
- 110/6.0 kV, 16 MVA substation at Dondo Cement Factory.
- ± 350m of 110kV double circuit transmission line connection to the existing EdM CL 71 110kV line, complete with 110kV underpass gantries.
Services Rendered:
- Engineering
- Assistance for Tendering
- Construction Supervision
Más información sobre este producto consulte en: http://www.norconsult.com/references/energy/mozambique/power-supply-dondo-cement-factory/