Descripción
ENVIAR EMAIL
- Independent Tests
The Center for Irrigation Technology (CIT) at California State University, Fresno conducted tests to determine clogging resistance of the screen design of Ore-Max 16mm 1 GPH emitterline. The test protocol used is a variation of the standard CIT emitter grit test, modified to double the total loading of grit. This modified test protocol has been used in successfully developing 2 GPH Ore-Max emitterline to achieve maximum clogging resistance. This severe test, using a wide spectrum of grit sizes, was necessary in order to pick up differences in design of the Ore Max emitter, which is much more resistant to clogging than other emitters.
Emitter model | Emitters in test | Gph/Cv clean water | End of test no. plugged | Gph/Cv working emitters 5500 ppm grit | No. emitters plugged after cleaning water | Gph/Cv working emitters after cleaning water |
---|---|---|---|---|---|---|
16mm 1 GPH small screen design | 20 | 1.05/.02 | 1 (5%) | 1.04/.02 | 0 | 1.04/.02 |
Más información sobre este producto consulte en: http://www.ore-max.com/?page=max-emitter/independent_tests