Descripción
ENVIAR EMAIL
BARRANCABERMEJA HDT 250K BPD
Barranca BermejaColombia
Client:
ECOPETROL
Owner:
ECOPETROL
Contract Duration:
Feb 2007 / Sep 2009
Scope:
EPC: Engineering, Procurement of materials, Civil engineering and construction, and Electromechanical Erection of a major expansion, including HDT infrastructure, tanks and piping works, structures, medium and low voltage distribution, instrumentation and control.
Más información sobre este producto consulte en: http://www.santoscmi.com/categories/oil-gas/downstream/refinary/barrancabermeja-hdt-250k-bpd.html