Descripción
ENVIAR EMAIL
GARABITO 200MW
PuntarenasCosta Rica
Client:
MAN B&W DIESEL
Owner:
ICE
Contract Duration:
Jun 2009 / Aug 2010
Scope:
Complete civil works for a 200 MW power plant and switchyard utilizing 11 x 18V48/60 medium speed engines manufactured by MAN and running on diesel. The scope includes the revision of the OEM’s engineering and the execution of earthworks, concrete foundations, steel structures, buildings electrical installations, internal roads and site finish grade.
Más información sobre este producto consulte en: http://www.santoscmi.com/categories/power/fossil/reciprocating-engines/garabito-200mw.html