LOMA DE LA LATA 180MW
NeuquénArgentina
Client:
UTE ISOLUX TECNA
Owner:
PAMPA ENERGÍA
Contract Duration:
Apr 2008 / May 2010
Scope:
Execution of detailed and supplementary engineering for the expansion of an existing thermoelectric gas-fired power plant, now composed of 3 General Electric Frame 9E gas turbines, for which 3 HRSG will be installed together with a Siemens 180 MW gas turbine and balancing of all plant equipment and systems.