PUEBLO VIEJO K501

Empresa:

Descripción

Santos CMI Chile

ENVIAR EMAIL

PUEBLO VIEJO K501

Sanchez RamirezDominican Republic

Client:

BARRICK

Owner:

BARRICK

Contract Duration:

Apr 2010 / Feb 2011

Scope:

Construction of pipelines from Hatillo reservoir to Hondo reservoir, tailings and reclaims. The scope includes carbon steel, HDPE and lined carbon steel piping pre fabrication and installation, all related concrete ans steel works, as well as roads construction.

Más información sobre este producto consulte en: http://www.santoscmi.com/categories/industrial-mining/mining-and-cement/pueblo-viejo-k501.html


    Formulario de Contacto





    Nombre Completo (requerido)

    Empresa (requerido)

    Correo electrónico (requerido)

    Teléfono (requerido)

    Página Web (si la tiene)

    Mensaje (Requerido)