Oil Power Plant References

Wärtsila Chile Ltda.

Descripción

Wärtsila Chile Ltda.

ENVIAR EMAIL

  • Gas conversion for reduced emissions and lowered operational costs.

  • Automatic voltage regulator increases power plant’s reliability.

  • Turbocharger upgrade brings economy into plant operations.

  • Significant savings through reduced lube oil consumption.

  • AGIP Ecuador is the operator of the 40,000 bpd Villano oil field in the Oriente jungle in Ecuador. Since the drilling

  • In 2001 the increasing demand for power, coupled with a lack of rain that caused many hydropower plants to stop

Más información sobre este producto consulte en: http://www.wartsila.com/resources/customer-references/energy/oil












Formulario de Contacto





Nombre Completo (requerido)

Empresa (requerido)

Correo electrónico (requerido)

Teléfono (requerido)

Página Web (si la tiene)

Mensaje (Requerido)