Tunnel System DokaCC

Doka Chile
Empresa:

Descripción

Doka Chile

ENVIAR EMAIL

  • re­duc­tion in tem­po­rary foun­da­tion ex­pen­di­tures thanks to the op­tion of trans­fer­ring loads in­to wall foun­da­tions
  • low­er labour costs due to few­er op­er­at­ing sta­tions
  • pro­ject-spe­cif­ic de­tail plan­n­ing by Doka En­gi­neer­ing
  • hor­i­zon­tal pre-as­sem­b­ly and safe par­al­lel-truss erec­tion ow­ing to screwed and tight­ly bolt­ed con­nec­tions
  • safe up.down ac­cess thanks to built-in lad­ders with lad­der cage
  • high lev­el of safe­ty against wall foun­da­tion tilt­ing and slid­ing thanks to op­ti­mised V-shaped strut an­gles
  • safe op­er­a­tion of stop-end formwork due to large-area work­ing plat­forms
  • safe pas­sage through lon­gi­tu­d­i­nal gra­di­ents up to ten per­cent us­ing hy­draulic drive

Más información sobre este producto consulte en: http://www.doka.com/en/system-groups/doka-load-bearing-systems/tunnel-formwork/Tunnel-system-DokaCC/index












Formulario de Contacto





Nombre Completo (requerido)

Empresa (requerido)

Correo electrónico (requerido)

Teléfono (requerido)

Página Web (si la tiene)

Mensaje (Requerido)