Descripción

Ficha actualizadaÚltima revisión: 29 de Septiembre de 2020

Producto y solución industrial

Multi-Level Expressway Formed With EFCO

Consulta información técnica, comercial y disponibilidad de esta solución de EFCO Chile.

Información del productoConsulta técnica y comercial
EmpresaEFCO Chile
ModalidadSolicitud de información
Revisión29 de Septiembre de 2020
01

Información sobre Multi-Level Expressway Formed With EFCO | EFCO Chile

Efco de Chile S.A.

ENVIAR EMAIL

> We are pleased to share with you 60 years of EFCO employees’ pride, passion, and ownership.

Multi-Level Expressway Formed with EFCO

Dallas, Texas

The LBJ Express is a $2.7B reconstruction of the heaviest traveled corridor in North Texas and the third most congested section of roadway in all of Texas. It provides a lateral connection of the two primary Northbound and Southbound arterial highways on the North side of Dallas. Over 270,000 vehicles use this roadway on a daily basis to connect from U.S. 75 and Interstate 35E. The reconstruction is expected to take five years to complete.

Más información sobre este producto consulte en: http://www.efcoforms.com/2015/03/multi-level-expressway-formed-with-efco/

02

Servicios y capacidades

Consulta disponibilidad, configuración, dimensiones, compatibilidad, capacidad, transporte, montaje y condiciones comerciales directamente dentro de IndustriaMinera.cl.

Producto consultado: Multi-Level Expressway Formed With EFCO
Empresa: EFCO Chile
Ir al formulario de contacto
04

Formulario de Contacto

* Solicita información referida a Multi-Level Expressway Formed With EFCO a EFCO Chile.