Descripción
ENVIAR EMAIL
Gigantic road tunnels in Shanghai
Herrenknecht Mixshields for river crossings
More gigantic figures: Some 1,500 people are employed at this large-scale jobsite. 2.7 million m3 of soil are to be removed and 74,720 segments installed.
Shanghai, China
Project background
Related content
Learn more about additional products and projects from the world of Herrenknecht
Even very large excavation diameters can be controlled
Efficient road tunnels created with tunnelling
Coinciding with the World Expo 2010 in Shanghai, two
Más información sobre este producto consulte en: https://www.herrenknecht.com/en/references/case-studies/road-tunnels-in-shanghai.html