Descripción
ENVIAR EMAIL
Oxford High School | Case Study
- Find out how we can help you make your buildings more efficient. or call 1-866-392-6487.
- (PDF)
- Assisted with building design to eliminate redundant systems and cabling
- Assumed the risk of implementing the network infrastructure and all connected technology systems
- Accepted responsibility for coordinating with contractors and suppliers that provided IP-based components and systems for the building
- Implemented the latest advancements in fire safety and access control
- Took responsibility for on-time delivery and performance testing
- Decrease its carbon footprint by the equivalent to the carbon sequestered by 537 acres of pine forest annually
- Save $6 million in energy and operational costs over 15 years
- Achieve LEED® Silver certification by the U.S. Green Building Council, the first certification of a high school in Mississippi
Más información sobre este producto consulte en: http://www.johnsoncontrols.com/content/us/en/products/building_efficiency/case_studies2/Education/oxford.html