Descripción
ENVIAR EMAIL
ACTIVITY AND RESOURCE-BASED SCHEDULER
OVERVIEW
KEY FEATURES
- Manual scheduler for short to long term schedules
- Resource-based scheduling
- Multiple activity types
- Calendar-based schedule with Gantt representation
- Direct 3D design of polygons and solids
- Dynamic access to multiple block models for reserves using the Unified Reserves Engine
- Destination capacities, constraints, and opening balances
- Display and manage destination design
- Maps material to destinations through intuitive graphical canvas
- Simulated destination calculations. (Beneficiation/wash plants, for example.)
- Direct link to MineSight Haulage for equipment cycle times
- Animation of schedule for all activity types and destinations
- User-defined constraints for destinations and blending algorithm for auto reclaim
- Full suite of dynamic and published reports
- Resource working calendars
- Resource leveling
- Auto spatial constraints
- Extraction and placement rules
- SQL database for data storage and security (MineSight Planning Database)
- User templates for quick start-up
- Customizable attributes
- Variable dig-rates by material
Más información sobre este producto consulte en: http://www.minesight.com/en-US/products/atlas.aspx