Civil Engineering Works and Retrofit Foundations Thermoelectric Plant Guacolda

Owner of the works: Andritz Chile SpA. Contract EPC with Guacolda Energía.

Duration: 15 months

The contract scope includes civil engineering works, earth moving, piling, foundations, concrete structures, lining or sheathing among others.

Works in Hoppers 11/12 3 OP-40 – El Teniente Level 7

Duration: 330 days.

Works mainly consist in the excavation and construction of an underground hopper with 1,700 m3 capacity and in the development of horizontal works.

Construction of Underground Works for Hydroelectric El Paso

Owner of the works: Hidroeléctrica El Paso

Duration: 425 days.

Contract for repairing the ascending intake tunnel of the Ventana’s Front and underground works for the hydroelectric plant El Paso. At the surface level, it includes the civil works needed for the construction of the initial plug, window plug and bulkhead plug of the tunnel, earth movements, protection and support enrockments for open excavations.

Drifts and Infrastructure Repairing for Mina Mayor 2011 – 2014

Más información sobre este producto consulte en: http://www.zublin.cl/en/fields-of-activities/project-execution/












Formulario de Contacto





Nombre Completo (requerido)

Empresa (requerido)

Correo electrónico (requerido)

Teléfono (requerido)

Página Web (si la tiene)

Mensaje (Requerido)