Descripción
ENVIAR EMAIL
- Independent Tests
The Center for Irrigation Technology (CIT) at California State University, Fresno conducted tests to determine clogging resistance of the screen design of Ore-Max 16mm 1 GPH emitterline. The test protocol used is a variation of the standard CIT emitter grit test, modified to double the total loading of grit. This modified test protocol has been used in successfully developing 2 GPH Ore-Max emitterline to achieve maximum clogging resistance. This severe test, using a wide spectrum of grit sizes, was necessary in order to pick up differences in design of the Ore Max emitter, which is much more resistant to clogging than other emitters.
| Emitter model | Emitters in test | Gph/Cv clean water | End of test no. plugged | Gph/Cv working emitters 5500 ppm grit | No. emitters plugged after cleaning water | Gph/Cv working emitters after cleaning water |
|---|---|---|---|---|---|---|
| 16mm 1 GPH small screen design | 20 | 1.05/.02 | 1 (5%) | 1.04/.02 | 0 | 1.04/.02 |
Más información sobre este producto consulte en: http://www.ore-max.com/?page=max-emitter/independent_tests

