Canatuan Mine

Knight Piésold Consulting

Descripción

Knight Piésold Consulting

ENVIAR EMAIL

Canatuan Mine Sulphide Tailings Storage Facility Dam

Highlights:

  • Sulphide Tailings Storage Facility Dam Design and Construction
  • Large Embankment Dam
  • Flooded Impoundment for ARD Mitigation
  • Large Excavated Spillway Through a Rock Ridge Upstream of Right Abutment of Dam
  • Design for Significant Seismicity
  • Embankment Core uses Moisture Sensitive Tropical Residual Soils

Client: TVI Resource Development (Phils.) Inc.

Location: Zamboanga del Norte, Philippines

Completion Date: Ongoing

Project Description: The Canatuan Sulphide Tailings Storage Facility is a valley type impoundment contained behind a large, cross valley, zoned earthfill/rockfill embankment dam. The dam has been raised in stages using the downstream method. Stage 3 of the dam has been completed to a height of 70 m, but the definition of additional ore reserves indicates that further tailings capacity will be needed. Stage 4 is being planned to a height of 85 m.

Más información sobre este producto consulte en: http://www.knightpiesold.com/en/index.cfm/projects/mining/canatuan-mine/